For the sake of a solemn commitment
 
    Daqing petrochemical Company Qingken Lake pipeline is the only drainage pipeline for dozen branch plants of central plant, because of long time running, appear that emitting, dropping and leakage many times. In order to repair 1.4 km long, 1020 mm diameter pipes, Daqing petrochemical Company gives the rigorous requirements that must be finished to repair within 48 hours.
 
    For this project, our company sets up the excellent project team by the experienced management personnel such as general engineer Mr. Ge YanChao, project Mr. Fan Xiangpeng, executive manager Mr. Shi Yanming, they lead by example and take the lead, meantime endure the northern 34 ℃ high temperature, use new technology, overcome the unfavorable factors such as limited site operation space, pipeline internal situation changes etc.  We deliver the repaired pipeline to Daqing petrochemical Company ahead of four hours, and have been highly praised by them.

     There is no way on the world, always someone walks one step first. This move is determination, the will, and ZTPE’s spirit! The staffs sleep only four or five hours each day in more than 10 days, overcame the unthinkable difficulties, in the " Mr. Wang Iron man story" hometown staged a "ZTPE iron man" story.

    Thanks for Daqing Project Department!
 
    Thank you my dear staffs!
                       
                                                                                  Chairman of ZTPE: Xiao Hua xu
                                                                   On July 10, 2015
                                                Photo 1: welding pipelines
                                           Photo 2: prepare to pass the pipes
Photo 3: pass the pipes on the site
 